Problem

Manual Layout Tracing

The first problem that we will address is manual layout tracing, which is the process of physically marking and transferring Blueprint measurements and structural elements to a construction site floor level.

Using tools like measuring tapes, chalk lines, and threads.

Manual Layout Tracing
Transferring Blueprint Measures
Layout tracing definition
Used Tools
Used Tools

Problem Manifestations

By our analysis, Over 2 billion dollars are lost every year in Moroccan construction due to rework, which could account for up to 12% of the construction project budget.

Impact of Rework In construction

Rework is mainly caused by communication problems and manual layout tracing methods, which are also:

Unreliable

Tools like tape measures and levels increases the risk of human error with each adjustment and calculation.

Untrackable

These methods are traditional and untraceable, leading to project management issues for companies.

Dangerous

Manual Tracing can be dangerous, especially on the edges of multistory buildings at elevated heights.

Outdated

They are the same methods the Ancient Egyptians used a long time ago to build the Pyramids.

Sluggish

Translating 2D blueprints into real-world locations requires substantial effort, time and collaboration.